Anyara Hills, Semenyih – One-Acre Bungalow Plots

ANYARA HILLS · SEMENYIH · FROM ONE ACRE

Walk the land before you draw the house

Imagine a shaded terrace facing the garden and a ground-floor room for your parents. At Anyara Hills in Semenyih, the lie of the land helps decide where both could go. The plots are freehold with individual titles, and the quotation is for land. House design, construction and landscaping are separate.

The lake, walking paths and hills at Anyara Hills · actual site photograph.
The lake, walking paths and hills at Anyara Hills · actual site photograph.
From one acre
Freehold individual title
Land-only quotation

Start with the life around the house

Picture where everyone sits after lunch, how your parents would move between their room and the garden, and whether you would enjoy caring for a larger outdoor space. Those choices can guide the land search before an architect starts drawing. A plot with the right shape and outlook for one family may suit another family quite differently.

Where would you start on a site walk?

Choose the part of the home you would plan first.

I’d start with how family arrive

Bring a sketch of the rooms you would want on the ground floor.

On the plot. Start at the road and trace the possible driveway to where you picture the front door. Note any level changes to discuss with your architect.

Ask about the arrival route →
I’d start with the garden

Pick the outdoor space you would use most, such as a shady seat or room for children to play.

On the plot. Stand where you would put it. Check the slope, the plot boundary and the outlook, then picture how you would get there from the house.

Ask about the garden →
Landscaped stream and paths at Anyara Hills · actual photograph.
Anyara Hills landscaped stream and paths. Developer-supplied site photo. The date of the photo is unknown.

Start at the roadside, then walk to where you’d want the garden

Stand where the driveway might begin. Look at how the ground rises or falls from the road and how a car would turn in. Then walk to where you’d put a terrace or garden. From there, you get a better feel for the outlook and can see where rainwater might run.

The developer’s masterplan shows the hills, roads and water features across the estate. When a plot looks right, ask for its current boundary drawing, levels, access and drainage details before settling on a house design.

Find the plot number on the supplied masterplan, then read its Step Up or Step Down marking. For that plot, ask for a side-on drawing showing the road, proposed house position and garden. That helps you picture the change in level before the visit.

Supplied English brochure, p. 32, masterplan legend; read 21 November 2026. The schematic does not give measured levels.

Anyara Hills masterplan · Developer project overview

Veranda beside the lake · actual photograph. The building is separate from the land quotation.
Veranda beside the lake · actual photograph. The building is separate from the land quotation.
The hills and varied terrain at Anyara Hills · actual photograph.
The hills and varied terrain at Anyara Hills · actual photograph.

What belongs in your land-and-home brief?

  1. Decide which rooms and outdoor spaces your family would use most.
  2. On a site walk, compare the plot’s shape, slope, access and available services with those needs.
  3. Take the plot details to your architect and plan the design, construction and landscaping separately from the land purchase.

Watch the project films here

The concept film plays here. Two dated progress videos are also available on YouTube; these are earlier updates, rather than a live site view.

▶ Concept film · 24 December 2024

Site update · 17 July 2026 ↗

Earlier bypass update · 12 March 2026 ↗

Phases, the hub and the route you can use today

The developer’s update supplied on 29 September 2026 says Phase 1 and 2 are ready for land handover, Phase 3 is tentatively due in 2028 and Phase 4 is not yet launched. Allow separate time for designing and building the home. The planned 10-acre lifestyle hub and Sungai Lalang bypass target Q1 2028. Use the existing roads for a visit today; the target is not an open-road announcement.

Title and a purchase through a company

The land has freehold individual title and remains agricultural land. The developer advises that conversion to residential title is not available; building plans follow the title conditions and approvals. The developer offers a company-based purchase route for foreign buyers. The company would hold the land; ask your solicitor to review the selected plot and company documents, rights, costs and approvals.

Land quotation and ongoing charges

The quotation covers land only. House design, construction and landscaping are separate. The developer’s September update estimates maintenance at about RM2,500 per month and utilities at residential rates; confirm the latest written charges for the plot. Goldhill Fortune Sdn Bhd, a KHK Land subsidiary, is the project developer.

The bypass infrastructure launch was held on 27 January 2026; it was not the opening of a completed road.

Prime Minister’s Office launch record →

Pick a plot to walk with Jacky

Tell me what you’d like to use the outdoor space for and when you might be in Semenyih, if you know. I’ll check which plots you can see and help plan a visit around the approach, slope and outlook. From overseas, we can go over the site information first.

Ask Jacky about a site walk

Prefer email? Contact Jacky →

Useful before you choose

Buying in Malaysia from overseasFreehold and leasehold, explainedBrowse other projects

Project facts and buyer paths reviewed 26 October 2026. Current availability, selected-unit quotations, furnishings and access are checked separately. Source reference

Jacky Yong · REN 77674 · Vivahomes Realty Sdn Bhd · E(1)1670

Scroll to Top