- Start with what you are buying
- Bring the homes you are actually considering
- At a glance
- What a plan can help you decide: KL360 B1 and B2
- New launch: contract dates and progressive payments
- Completed developer stock: check the contract as well as the unit
- Subsale: inspect the home and write down what stays
- Put your decision on one page
- Foreign-buyer eligibility is a separate check
Start with the home and the handover you need
Homes at a similar budget can lead to very different plans: one may be ready sooner, another may still be under construction, and a third may come from an existing owner.
Bring the homes on your shortlist into the same conversation
Send Jacky up to three unit links, plus the month and year you need the keys. He can help sort out which homes you can inspect now, which details depend on documents, and how the timing and cash needed compare before you arrange viewings.
At a glance
| Route | Seller | What you can inspect | Timing and cash question |
|---|---|---|---|
| New launch under construction | Developer | Plans, show unit, site and reported construction progress. | Which prescribed SPA applies, what are the payment stages, and what is the unit’s contractual vacant-possession date? |
| Completed developer stock | Developer or a company that owns the unit | The building and, if access is allowed, the selected unit. | Was CCC already issued when this SPA is signed, and what handover, payment and defect terms does this contract actually contain? |
| Subsale | Current owner | The actual unit, view, common areas and current condition, subject to access. | What completion period, vacant-possession arrangement and inventory are written into the negotiated SPA? |
“Completed developer stock” is a useful comparison label, not a legal SPA category. The seller, CCC date, buyer’s contract and applicable law determine the route for the actual home.
Which KL360 layout fits the second room: B1 or B2?
Both KL360 plans offer 650 sq ft, two bedrooms and two bathrooms. Start with the person who will use each room: does the second bedroom need to fit a bed, a desk or both? The original plans give you something concrete to discuss before visiting the gallery.
Both plans show two bedrooms and two bathrooms. They are layout examples, and the drawing’s orientation does not tell you the view from a particular unit. Furniture is illustrative. Tap either plan to enlarge it.
At the gallery, ask which plan the show unit follows and which fittings are included in the sales specification. If you are considering a completed developer unit or a subsale, seeing the actual home lets you judge its condition, light and noise, and note what will stay. Those details lead into the contract and handover questions for each route below.
Explore KL360’s original plans and planned sky deck →KL360 plan example checked 25 October 2026. The legal guidance and sources below retain their 23 October 2026 check date.
If it is a new launch, let the SPA set the dates
For a covered housing development, the Housing Development (Control and Licensing) Act 1966 and regulations prescribe SPA forms and payment terms for relevant transactions. KPKT’s buyer guidance lists Schedule G for certain landed homes and Schedule H for strata homes, with other schedules also prescribed for specific development types. So the words “new launch” alone do not tell you which agreement or protections apply. Ask your solicitor to identify the schedule and review the signed SPA.
For a sale by a licensed housing developer within the regulated scheme, KPKT says the developer cannot collect a payment before the SPA is signed; payments are those set out in the contract and its prescribed instalment schedule. If someone asks for a booking payment first, let your lawyer classify the transaction and explain the written refund terms before you transfer money. A private subsale or a transaction outside the prescribed route does not automatically have the same payment schedule or statutory protections.
The applicable prescribed SPA may tie progress payments to construction stages, which affects when the bank releases your loan. Put the written instalments beside loan disbursement, progressive interest, stamp duty and the other costs. KPKT’s buyer guidance describes VP periods of 24 months for certain landed Schedule G homes and 36 months for certain strata Schedule H homes; 36 months is not a promise for every project. The actual schedule and SPA commencement date set the contractual completion date. A sales estimate or target month is a different date.
TEDUH, KPKT’s portal, can help you look up the project and developer, licence and advertising permit details. Before paying, ask a solicitor to check the current documents for the exact unit.
For a completed developer unit, look at the agreement alongside the home
A completed unit could be newly built unsold stock, held by a developer, refurbished, or sold by a related owning company. If access is available, inspect the home and building. Ask for the CCC date, who will appear as seller in the SPA, the contract form, included fittings, handover status and any work still outstanding.
KPKT’s guidance says the prescribed Schedule G/H/I/J terms do not apply where a CCC has already been issued by the time the sale contract is completed and a certified copy has been given to the buyer. Read that completed-home SPA and its defect arrangements on their own terms. A developer seller alone does not mean the usual 24-month defect-liability period applies. Under prescribed Schedule G and H SPAs, KPKT says DLP is 24 calendar months after vacant possession; that rule does not automatically cover a completed post-CCC contract outside those schedules.
If refurbishment is part of the offer, ask for a written itemised scope covering the exact unit, common areas, fittings, appliances, completion date and remedy for unfinished work. Add the building’s management charges and any outstanding sums to the picture.
For a subsale, see the home and agree what stays
With a subsale, the seller is an existing owner, so the home itself becomes part of the decision. Find out whether it is vacant, owner-occupied or tenanted, and when vacant possession is due. During an inspection, look at wear, water marks, noise, light, ventilation, water pressure and repairs. Ask for current maintenance and sinking-fund statements, including any arrears.
Before you settle on the price, write down the fixtures, furniture, appliances, car park and other inclusions. The Malaysian Bar recommends providing an inventory to the solicitor and attaching the agreed list to the SPA. Your lawyer can then check title, charges, redemption, consent, completion dates and the obligations each party has agreed to in that specific contract.
Put your decision on one page
- Purpose: own stay, part-time base or rental
- Month you need the keys
- Cash available before handover
- Repair, furnishing and moving allowance
- Need to inspect the selected unit: yes/no
- Comfortable waiting until
- Main concern: timing, condition, cash flow or eligibility
Your move date can help sort the shortlist. If it is fixed, start by comparing completed homes; if you have more time, an under-construction launch may stay in the mix. A completed developer unit can suit you when its contract and condition are clear. A subsale may fit when the actual home and repair budget work for you.
If you are buying as a foreigner, check eligibility for this home
Whichever route you prefer, eligibility depends on the actual home: state, property category, title, price threshold, buyer name and required consent. The way the home is sold does not establish that a foreign buyer is eligible. Ask your lawyer to confirm before you commit.
General information for property planning, not legal, immigration, tax or financial advice. Rules and procedures can change. Confirm current requirements with the relevant authority, licensed operator, bank or Malaysian lawyer for your case. Property shortlisting does not confirm immigration or legal eligibility. Jacky Yong, REN 77674, Vivahomes Realty Sdn Bhd (E(1)1670).
If you want to read the source material
- KPKT National Housing Department: buyer guidance, approved SPA schedules and VP terms
- KPKT DLP system: completed-property CCC exception to prescribed schedules
- KPKT: 24-month defect liability under prescribed Schedule G/H
- KPKT TEDUH housing portal
- The Malaysian Bar: subsale SPA, completion and inventory